METRO HA NOI
Owner: Hanoi Metropolitan Rail Transport Project Board
Scale: all M&E engineering design for the project includes 9.6km of elevated sections and 2.9km of underground sections
Complete: 2010
Các dự án khác
- BINH NGUYEN PHARMACEUTICAL FACTORY IN CAN THO CITY (26.10.2014)
- THANH PHU PACKING FACTORY (26.10.2014)
- BINH DUONG – BINH PHUOC INDUSTRIAL ZONE (26.10.2014)
- HUNG PHU – CAN THO INDUSTRIAL PARK (26.10.2014)
- WOOSHU COMPLEX 4 STAR HOTEL IN BIEN HOA CITY (26.10.2014)