SAI GON METRO LINE (BEN THANH – SUOI TIEN)
Owner: The Management Board of urban railway
Scale: all M&E engineering design for 19,7 km metro with 2,6 km of underground and 17,1 km of elevated sections, on the area of 20,9 ha
Complete: 2020
Các dự án khác
- BINH NGUYEN PHARMACEUTICAL FACTORY IN CAN THO CITY (26.10.2014)
- THANH PHU PACKING FACTORY (26.10.2014)
- BINH DUONG – BINH PHUOC INDUSTRIAL ZONE (26.10.2014)
- HUNG PHU – CAN THO INDUSTRIAL PARK (26.10.2014)
- WOOSHU COMPLEX 4 STAR HOTEL IN BIEN HOA CITY (26.10.2014)