HUNG PHU – CAN THO INDUSTRIAL PARK
Mars Corporation was responsible for designing medium voltage and low voltage electricity supplying system, transformer station, external lighting system, mechanical ventilation and air – conditioning system, fire – preventing and fire fighting system, plumbing & drainage system, waste water treatment system on an area of 474 hectares
Owner : Sai Gon – Can Tho Industrial Park Corporation
Scale : 474 hectares
Complete : 2009
Các dự án khác
- BINH NGUYEN PHARMACEUTICAL FACTORY IN CAN THO CITY (26.10.2014)
- THANH PHU PACKING FACTORY (26.10.2014)
- BINH DUONG – BINH PHUOC INDUSTRIAL ZONE (26.10.2014)