details article

SHERATON NHA TRANG HOTEL – FIVE STAR

 

Mars Corp was responsible for all M&E engineering designs and M&E supervision consulting including 33 storeys with deluxe rooms, swimming pool, ball room, restaurant with construction area of 50,000 m2.

* Scope of work:

1. M&E Engineering Design:

  • Electrical services system.
  • Lightning protection system.
  • Lighting control system.
  • Intelligent building management system.
  • CCTV, PA, Access control system.
  • Fire alarm system.
  • Voice and data system.
  • ACMV system.
  • Fire protection system.
  • P&D system.
  • Water treatment and waste water treatment system.

2. Pre-construction Management

  • Co-ordination and combination Design
  • Inspecting minutely all M&E engineering designs.
  • Overseeing and evaluating designs: electrical supplying system and lighting system, intercommunication system, plumbing and drainage, fire fighting system, mechanical ventilation and air-conditioning system, CCTV and access control, building management system

3. Prepare M&E budget and Tender document

4. M&E supervision

Owner : Dong Hai Real Estate and Tourist Corporation
Completed                             : 2007